Quieting an upstairs floor without opening the ceiling
Because the ceiling below is usually finished, upstairs squeaks are normally fixed from above, and the floor covering decides how. The first step is finding the joists under the spot: rows of nail heads where the subfloor is exposed, a stud finder, or a measurement taken from a joist you can see through a heat register opening. Joists usually run 16 inches on centre, but that is checked, not assumed. Under carpet, a snap-off screw goes through the carpet and subfloor into the joist, the head breaks off below the surface, and the pile closes over it. Under hardwood, a pilot hole and a trim-head screw go through the board into the joist, and the countersunk head is filled to match. A floating floor must not be screwed down, because it is designed to stay unfastened, and tile is not screwed through, so a squeak under either is reached from the ceiling below or left alone if it is minor. If the joists are engineered I-joists, the flanges are never cut, drilled or notched, so the fix is fastening down into the top flange and nothing is cut into the joist. Opening a ceiling is a last resort, and if it is needed you will know before any work starts, because it changes the scope.