The Junction: two building waves, both on plank
A Junction house usually dates from one of two building waves, and the gap between them helps place it. The first wave came in the late 1880s. Building effectively stopped from 1893 to 1900, then resumed after 1900.
Both waves predate plywood, so the era-typical floor is strip hardwood over plank subfloor on sawn joists. The modern exception is the former Ontario Stockyards land, between Keele, Runnymede, St Clair and the CP tracks. Much of it now holds big-box stores and new housing with a modern floor system.